Do you still have any of these?
Maybe it’s time to upgrade.
Don’t let a failure stop production. Start your PLC-5
migration to ControlLogix today.
Due to the end-of-life status of Allen-Bradley® PLC-5® hardware, the cost and scarcity of replacement parts, and increasing risk of using obsolete hardware – we urge you to upgrade now. Start planning your PLC-5 migration to the ControlLogix® platform today. Cates can help!
The Cost and Risk of Using PLC-5 Hardware is Increasing
PLC-5 Hardware is Obsolete
Rockwell Automation discontinued the 1785 and 1771 series hardware in June 2017 and no longer sells or supports it.
Many Systems Continue Using It
Don’t risk a failure without an available replacement to minimize downtime. We urge you to migrate to the ControlLogix platform.
Replacements are Scarce
Many users buy expensive components from third party suppliers — increasing cost and risk as the parts often have no guarantee.
Assess the Impact of a PLC-5 Failure
- The Allen-Bradley PLC-5 controls many critical manufacturing processes
- What would the business impact be if a replacement were not available onsite or online?
- Potential loss of income and other negative consequences can justify an upgrade
Map Out Your PLC-5 Migration to ControlLogix
Planning Ahead is Critical
Scheduled PLC-5 upgrades can take weeks or months depending on I/O replacement level, software integration and available downtime.
Increase Scheduling Options
Planned conversions can be done over time and at your convenience to satisfy ongoing production schedules.
Reduce Cost, Risk and Stress
Planned migrations are less expensive and reduce the risks associated with upgrading an entire facility at once.
Get Expert Assistance from Cates
We’ve done 100s of successful conversions
PLC-5 System
Conversions
1771 Series
Chassis Conversions
I/O Points
Migration Expertise Across Industries
Food and
Beverage
Building
Materials
Material
Handling
Product
Manufacturing
Water and
Wastewater
Oil and
Gas
Experience with Large Migrations
Using conversion kits and rewire swing arms, our engineers have done complex upgrades for Fortune 500 firms with tight deadlines.
Before PLC-5 Migration
After PLC-5 Migration
Attention to Schedule and Budget
Our experience allows us to meet your migration plan specifications and schedule, or to help you develop a plan to meet your schedule and budget.
Complimentary Services
Discuss your upgrade path with our experts and receive a complimentary remote or on-site system analysis. Whether your project is large or small we’re here to help at whatever points you need assistance.
Start Planning Your Upgrade Today
Information Request
Email us your
PLC-5 migration questions.
Talk to Our Experts
Call us today to discuss
your PLC-5 upgrade.